| Project Name-
 
 Construction of 521.23m long Pre-stressed Concrete 
						Girder Bridge (Tailerdeep Bridge) at 23rd k.m. of 
						Patiya-Anwara-Banshkhali-Toitong Road under Dhohazari 
						Road Division.
 
 Client-
 
 Roads & Highways Department
 Ministry of Communication
 Government of Bangladesh
 
 Project Cost in Million-
 
 BDT 432.04
 (Equivalent to USD) 7.96
 
 Salient Feature-
 
 • Pre-stressed concrete girder & RCC 
						bridge
 • Approach road
 • Piling work :
 i) Land based pile (750 mm dia 30m long cast-in-situ bored pile)
 ii) Water based piling by barge mounted rig (1000 mm dia 35 m long 
						cast-in-situ bored pile)
 iii) Total Nos. of pile 173 Nos.
 • Temporary jetty for pre-stressing work
 • Length of bridge 521.23m
 • Width 9.5m (2 lane)
 • Nos. of span 12 Nos.
 • Nos. of PC girder 60 Nos.
 • Nos. of pier 11 Nos.
 • Abutment 2 Nos. & counterfort type
 