| Project Name-
 
 Construction of 630.50 metre long Pre-stressed Concrete 
						Girder Bridge (Daratana Bridge) on cast-in-situ bored 
						pile foundation at 2nd k.m. of Bagerhat-Pirojpur Road 
						over River Bhairab under Bagerhat Road Division.
 
  Client- 
 Roads & Highways Department
 Ministry of Communication
 Government of Bangladesh
 
 Project Cost in Million-
 
 BDT 376.67
 (Equivalent to USD) 7.53
 
 Salient Feature-
 
 • Pre-stressed concrete girder & RCC bridge
 • Approach road
 • Piling work:
 i) Land based pile (760 mm dia 30mlong cast-in-
 situ bored pile)
 ii) Water based pile by barge mounted rig (1000
 mm dia 40m long cast-in-situ pile)
 iii) Total Nos. of pile 168 Nos.
 • Temporary jetty for pre-stressing work
 • Length of bridge 630.50m
 • Width 10.00m(2 lane)
 • Nos. of span 13 Nos.
 • Nos. of PC girder 65 Nos.
 • Nos. of pier 12 Nos.
 • Abutment 2 Nos. & counterfort type
 