| Project Name-
 
 Construction of 383.02m long & Pre-stressed Concrete 
						Girder & Steeltruss Bridge (2nd Dholeshwari Bridge) on 
						Cast in-situ bored pile foundation at 18th k.m. of 
						Dhaka-Khulna Highway under Munshigonj Road Division.
 
  Client- 
 Roads & Highways Department
 Ministry of Communication
 Government of Bangladesh
 
 Project Cost in Million-
 
 BDT 331.60
 (Equivalent to USD) 7.99
 
 Salient Feature-
 
 • Pre-stressed concrete girder & steel truss and RCC 
						bridge(composite construction)
 • Approach road
 • earth work, flexible pavement, asphalt concrete work
 • River training & bank protection work
 • Piling work:
 i) Land based pile (1000 mm dia 30m long cast-in-
 situ bored pile)
 ii) Water based pile by barge mounted rig (1000 mm
 dia 35 m long cast-in-situ bored pile)
 iii) Total nos. of pile 118 Nos.
 • Temporary jetty for pre-stressing work
 • 2X88m steel truss erection
 • Length of bridge 383.02m
 • Width10m (2 lane)
 • Nos. of span 8 Nos.
 • Nos. of PC girder 30 Nos.
 • Nos. of pier 7 Nos.
 • Abutment 2 Nos. & counterfort type
 